Corporation for Better Housing — affordable housing pipeline
Corporation for Better Housing has 3 affordable housing projects in the recent California LIHTC pipeline — 0 funded with 9% tax credits and 3 with 4% credits, totaling roughly 537 units across 3 counties.
Working with Corporation for Better Housing on an upcoming development? BUILDLAB designs the low-voltage, security, and life-safety scope these projects depend on — structured cabling, surveillance, door access, and fire & life safety, engineered in-house.
Search for Corporation for Better Housing3 projects · 537 total units
Cesar Chavez Apartments
Fresno, Fresno County
- Builder: Corporation for Better Housing
- Units: 54 (53 affordable)
- Type: New Construction
- Status: Preliminary Reservation
- Tax credit: $2.0M/yr federal + $12.1M state
- App #: CA-2025-603
Julian Street Studios
San Jose, Santa Clara County
- Builder: Corporation for Better Housing
- Units: 305 (301 affordable)
- Type: New Construction
- Status: Preliminary Reservation
- Tax credit: $6.4M/yr federal + $36.1M state
- App #: CA-2024-503
Vera Avenue Apartments
Redwood City, San Mateo County
- Builder: Corporation for Better Housing
- Units: 178 (176 affordable)
- Type: New Construction
- Status: Preliminary Reservation
- Tax credit: $4.4M/yr federal + $24.0M state
- App #: CA-2024-493
Building affordable housing in a Corporation for Better Housing project?
BUILDLAB designs and coordinates the low-voltage, security, and life-safety scope these projects depend on — Division 27/28 structured cabling, IP surveillance, door access, DAS/ERCCS, and common-area networks — engineered in-house and coordinated across every trade to keep infrastructure costs contained. Get a free budget estimate scoped to your unit count and building type.
Data source: California Tax Credit Allocation Committee (CTCAC). Map © OpenStreetMap contributors.
Ready to Work, Let's Chat
Our team of experts is ready to collaborate with you every step of the way, from initial consultation to implementation.






